Wednesday, June 19, 2013

Stapling CDX Plywood to the Subfloor

Instructions for Stapling CDX Plywood to the Subfloor

  • Set the plywood to sit for several hours in the room in which will be installed
  • Make sure the subfloor is not wet and structuraly sound
  • Install with 1″ deck scews into sheet of plywood, smooth side facing upward
  • Make sure the underlayment sems are not aligned with the subfloor seams
  • Lay the following plywood sheet – start along the longest wall and leave 1/4″ expansion gaps in between sheets and between the sheets the walls
  • Secure the plywood sheet every 6″ – make sure to drive the deck screw heads bellow the surface of the plywood sheet
  • Cut the plywood shets as required to follow the surface of the floor
  • Apply floor patching over the screw heads and the plywood seams
  • After the patching compound has dried, sand the compound
  • Vaccum and wipe with a damp cloth all the resulting dust
  • No comments:

    Post a Comment