Wednesday, June 19, 2013
Stapling CDX Plywood to the Subfloor
Instructions for Stapling CDX Plywood to the Subfloor
Set the plywood to sit for several hours in the room in which will be installed
Make sure the subfloor is not wet and structuraly sound
Install with 1″ deck scews into sheet of plywood, smooth side facing upward
Make sure the underlayment sems are not aligned with the subfloor seams
Lay the following plywood sheet – start along the longest wall and leave 1/4″ expansion gaps in between sheets and between the sheets the walls
Secure the plywood sheet every 6″ – make sure to drive the deck screw heads bellow the surface of the plywood sheet
Cut the plywood shets as required to follow the surface of the floor
Apply floor patching over the screw heads and the plywood seams
After the patching compound has dried, sand the compound
Vaccum and wipe with a damp cloth all the resulting dust
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment